Bellmore Merrick CHSD, NY

Equivalent to 247 tons of Carbon Dioxide saved.

Stony Brook University, NY

Equivalent to 204 tons of Carbon Dioxide saved.

Ferndale Schools, MI

Equivalent to 20.2 tons of Carbon Dioxide saved.

City of Gardner, MA

Equivalent to 39.2 tons of Carbon Dioxide saved.

Shoreham-Wading River Schools, NY

Equivalent to 44.2 tons of Carbon Dioxide saved.

Town of Branford, CT

Equivalent to 133 tons of Carbon Dioxide saved.

Northport Schools, NY

Equivalent to 16 tons of Carbon Dioxide saved.

Valley Stream CHSD, NY

Equivalent to 210 tons of Carbon Dioxide saved.

Town of Enfield, CT

Equivalent to 86.8 tons of Carbon Dioxide saved.

Federal Bureau of Prisons: El Rino, OK

Equivalent to 703 tons of Carbon Dioxide saved.

Bernie Steiger

Bernie Steiger

Mr. Steiger has thirty-four years of engineering experience in all phases of design and construction administration. Responsible for design and quality control of plans and specifications for boiler plants; steam systems; water and wastewater treatment systems; odor and air pollution control systems; heating, ventilating and air conditioning systems; process and fluid flow systems; heat and energy transfer systems; plumbing systems; and instrumentation and control systems. System analysis and design projects have included steam boiler blow down control, blow down heat recovery, boiler sequence control, steam sequence control, flash steam recovery, oxygen trim control, combustion control, exhaust draft control, boiler economizers, flue gas condensers, boiler turbulators, and steam and condensate metering.

Mr. Steiger received his BSME degree (cum laude) in 1979 from Ohio University and is a licensed professional engineer in Florida, Indiana, Kentucky, Ohio and Texas and Massachusetts (in process).

Mr. Steiger is a life member of the American Society of Mechanical Engineers.

High quality energy conservation solutions with fast return on investment