Zero-Cost Steam Trap Repair Program

Powered by National Grid Incentives. Delivered by Steam Management Inc.

Steam Management, Inc. is a National Grid ProNet Gold Partner and NAESCO-Accredited Energy Efficiency Contractor helping K-12 schools across New York State achieve significant steam system savings at no cost through limited-time utility incentives from National Grid.

These rebates are set to expire at the end of 2025, making now a great time to act and secure long-term energy and cost savings for your facility!

Thus far, Steam Management has completed installing 25,000 steam traps in over 35 school districts in Downstate New York, generating over 1 million therms saved. That equates to saving over 5,300 tons of CO2 per year or removing almost 1,200 passenger cars from the road!

Trusted and Recognized by National Grid:

2023 & 2024 Downstate Gas Energy Efficiency Top Partner of the Year

2024 Upstate Gas Energy Efficiency Top Partner of the Year

2024 Upstate Gas Pipeline Builder of the Year

Take advantage of this turnkey zero-cost program for steam trap repairs

No up-front costs

Improved energy efficiency and system reliability

Reduced annual fuel costs of 10s of thousands of dollars

High quality top-of-the-line components

Minimal oversite required for installation

Easy application process

Does Your Facility Qualify?

Your facility has steam boilers firing on National Grid natural gas

Your steam trap repairs/replacements have not been incentivized by National Grid in the past 6 years 

Download our project impact calculator to estimate your savings!

*Most projects qualify at little to no cost, restrictions may apply.

  • "Bellmore-Merrick Central High School District implemented Steam Management, Inc’s Zero-Cost Steam Trap Repair program to upgrade 1,850 steam traps across all 6 of our schools. Their team's exemplary communication and project management skills stood out, allowing them to efficiently complete the project amidst a busy period for our district. SMI streamlined the process for us, delivering professional and high-quality services that I confidently recommend to others."

    Jon Simpkins, Director of School Facilities & Operations, Health & Safety and Security - Bellmore-Merrick Central High School District

  • "In late 2023, the Locust Valley Central School District contracted with Steam Management, Inc. to replace over 300 steam traps in two of our schools through the National Grid Zero-Cost Steam Trap Repair program. SMI made the process extremely easy, taking care of everything along the way. They completed all the work in a very short period before the heating season. Their communication and professionalism throughout the project were very refreshing. SMI delivered high-quality services and savings, and I would highly recommend them to others without hesitation."

    Erik Nakutavicius, Director of School Facilities & Operations, Locust Valley CSD

  • “SMI has a turnkey steam trap replacement solution that we implemented in our buildings in North Merrick. Their team was impeccable, working within our timeframe, installing high-quality products, and on-site project management. I've heard the same from others who have used SMI’s services.”

    Samuel Carder, Director of School Facilities & Operations, North Merrick Union Free School District

  • "Through their Zero Cost Steam Trap Repair Program, Steam Management Inc. replaced or rebuilt over 1,300 steam traps in twelve buildings in the Syracuse City School District.  Their team completed this work while school was in session without any issues or impact on the education of our students.  We look forward to seeing how much energy we save during the next heating season and how much our operations improve due to this work.  I highly recommend others with steam heating systems utilize Steam Management’s services.  Their performance was exemplary."

    Thomas Ferrara, Syracuse Central School District Director of Facilities

Step 1: Following initial consultation call, the client completes and signs the Rebate Application form, Release of Funds Letter, and W9

Step 2: Project preparations are made and site survey scheduled

Step 3: Facilities survey for equipment verification and installation commences

Step 4: Project is complete and client is provided with a line-by-line as-built. Project is funded directly from National Grid

flow chart: sigh up, project prep, survey and install, and close-out

4 Simple Steps:


Let’s schedule a quick consultation to see if your school qualifies for free steam trap repairs through National Grid’s incentive program.

Chase Bean, MBA, PE, PMP, CEM - VP of Revenue & Engineering

678-457-3230  cbean@steammgt.com