Case Study

Steam System Engineering Support for Veterans Hospital ESPC Project Development

SMI Impact

x

x

x

x

Customer

x

Conditions

SMI executed the following turnkey scopes across 15 campus buildings:

Full Steam System Audit

  • Performed a comprehensive audit of the steam system, including 15 buildings and associated steam tunnels.

  • Tested and tagged steam traps using ultrasonic and infrared testing.

  • Documented trap locations, applications, operating pressures, and failure modes.

  • Developed engineering calculations and savings models to support ECM prioritization by quantifying energy losses and project savings.

  • Provided detailed reporting, mapping, and field data to inform system upgrades.

Steam Trap Replacements

  • Replaced failed steam traps with VA-compliant components (non-cast iron/malleable materials).

Solution

Steam system insulation
Insulation upgrades
thermal testing steam system

Schedule an Assessment of Your Facility

info@steammgt.com
1-800-731-0131