Contact us to schedule a steam system assessment
Chase Bean
VP of Engineering & Revenue
Adam Kellar
Director of Engineering
Jeffrey Weiss
Senior Project Engineer
Bringing Steam ECMs From Concept to Completion
-
Uncover Hidden Energy Waste
Data-driven evaluations of your steam infrastructure to identify inefficiencies, performance issues, and upgrade opportunities. -
Pinpoint Failures and Losses
Focused inspections of key components to prioritize repairs that deliver rapid payback and improved system reliability. -
From concept to implementation, we support projects with feasibility studies, 3D scanning, CAD design, equipment sizing, and energy savings forecasting — ensuring smart, data-backed decisions at every step.
-
Recover Heat and Reduce Waste
Enhance energy and water recovery while lowering chemical costs and minimizing sewer charges through optimized condensate management. -
Real-Time Visibility = Smarter Decisions
Install sensors and monitoring tools to track system performance, detect issues early, and validate energy savings over time. -
Keep Systems Performing at Their Peak
We revisit system performance post-upgrade to ensure long-term efficiency, prevent drift, and support your reporting needs. -
Capture and Reuse Waste Energy
Integrate economizers or flash steam recovery to boost efficiency and reduce fuel consumption with minimal disruption.
From initial assessment and engineering through design and implementation, our team helps move complex steam opportunities forward with confidence.
TURN STEAM SYSTEM QUESTIONS INTO PROJECT-READY SOLUTIONS
Case Study: Automation Project Provides Steam System Efficiency and Control Enhancements at Weyerhaeuser Veneer Mill
Material Manufacturing Facility Assessment: Biomass Boilers, Propane Retrofit, Flash Steam Recovery, Steam Traps, Metering
Pulp & Paper Facility Assessment: Steam Traps, Boiler Pressure Reduction, & Boiler Blowdown Heat Recovery
Insulation Manufacturing Facility Assessment: Boiler Replacements, Propane Vaporizer, Retiring Steam/Condensate Lines, Recommissioned VFD
Tool Manufacturing Facility Assessment: Condensing Boiler, Heating Steam Load Reduction Potential, Burner Replacements