Continue the conversation on how we can support your next project!

Chase Bean Engineer Steam Management

Chase Bean

VP of Engineering & Revenue

Efficiency Solutions That Strengthen ESPCs

With expertise covering the full steam cycle, our comprehensive solutions help customers leverage their investment and get the most out of their energy system, ensuring shared success for all parties.

Mechanical Retrofit Solutions

Boiler Replacements

Steam boilers, Hot water boilers, Condensing boilers, Electric boilers

Burner Retrofits & Replacements

Blowdown Heat Recovery

Blowdown Control Upgrades

Waste Heat Recovery Units


Condensate Pump Repairs & Replacements

Pressure Optimization

Economizers

Combustion Air Pre-Heaters

Flash Steam Recovery

Condensate Return Optimization

3D Scanning for More Constructible Retrofit Designs

Accurate existing conditions are essential to effective design. SMI uses LiDAR 3D scanning to capture detailed mechanical room and steam system conditions, helping identify spatial constraints, piping conflicts, and other challenges before installation begins.

Accurate designs • Better equipment and piping coordination • Reduced field uncertainty • Efficient installation planning

Why ESCOs Partner with Us

Trusted partners and steam experts with extensive field experience and a proven track record in ESPC projects

Contract-driving measures delivering positive cashflow, supported M&V, safety improvements, and fast paybacks

Supports the entire project lifecycle — from preliminary audits through post-installation support

Turnkey solution provider from assessment to commissioning

How We Collaborate with You

We understand the unique needs of ESCOs and offer flexible ways to partner.

  1. Paid Audit
    We perform a paid audit and scope development.

  2. Deferred Risk
    We perform the audit at-risk and defer payment to construction. If the project does not proceed, a breakage fee covers our development costs.  Typically formalized through an MOU.

  3. At-Risk Partnership
    No upfront or deferred payment guaranteed. We invest our time and resources alongside you with the understanding we will be contracted to execute the work if the project moves forward. Typically formalized through an MOU.

Common Payback Drivers


Failing steam traps waste steam, reduce system efficiency, and increase fuel costs. By identifying and repairing or replacing malfunctioning traps, facilities can quickly reduce energy losses, often with paybacks under 2 years. Typical failure rates exceed 20–30% in aging systems

Steam Trap Repairs & Replacements


Uninsulated valves, fittings, and piping in steam and hot water systems account for significant thermal losses. Installing or upgrading conventional and removable insulation delivers safety and performance improvements and fast, measurable energy savings, often with paybacks under 3 years.

Insulation Upgrades

CASE STUDIES

Schedule a Technical Presentation

Schedule a technical presentation for your team and further your expertise on steam systems while earning PDH credits!

Contact us today to learn more about how we can support your next project!

Chase Bean Engineer Steam Management

Chase Bean

VP of Engineering & Revenue